

Customized electrical projects to guarantee safety, savings, and performance.
Electrical Projects
Functionality, safety, and cost-effectiveness: we develop the ideal infrastructure to boost your industrial operation.
Technology and Engineering of High Complexity

In the underground level, where a large volume of mechanical equipment is concentrated, BIM compatibility ensures that each system has its defined space. Maintaining the same color scheme as the previous video, each discipline was modeled side-by-side with the structure and equipment, without hidden conflicts. Complexity that becomes precision, from the design to the bill of materials.
3D Projects: Precision to Reduce Risks and Accelerate Results
At TSE Engenharia e Automação, we use 3D modeling and simulation to develop highly complex industrial projects with maximum precision. Even before construction begins, our clients can visualize the entire plant, identify potential interferences, and validate each stage of the project.
The model shown here demonstrates how digital engineering contributes to reducing rework, optimizing costs, increasing the predictability of execution, and ensuring greater safety throughout the implementation process.
Power and instrumentation projects: engineering that connects efficiency and reliability.
An efficient industrial operation begins with a well-structured project. We develop complete power and instrumentation projects that strategically integrate electrical systems, automation, infrastructure, and industrial cabling.
The result is more efficient projects, greater productivity in implementation, and operations prepared for the challenges of modern industry.

In this main riser of the industrial plant, a single 3D model brings together all the compatible disciplines. Red for lighting, blue for power, green for instrumentation, purple for structured cabling — integrated into the architectural and mechanical modeling, with careful attention to accessibility for future installation and maintenance. The result: anticipated interventions even in the design phase, and a bill of materials that accurately reflects the construction.
